Don't miss the chance. Get your First Order. * 10% off * use the coupon code - WELCOME10
The bridge was designed to accommodate a challenging nine-degree curve and steep gradient. Built entirely by local labor under British supervision, the construction faced significant logistical challenges, including difficult terrain and material transport. Completed in 1919, the bridge has since stood resilient, showcasing innovative engineering solutions such as concrete cornice blocks for arch support and locally produced sand-cement blocks for facing